Skip to content
Roofing contractors: per-panel detach and reset quotes (708) 726-6801
Solar Panel Removal Orland Hills logo

One coordinated calendar

Roof Replacement Under Solar Panels in Orland Hills, IL

Takedown, shingles and reinstall booked as one itinerary, with each step starting as the previous one wraps up.

Weathered shingle roof with two dormers and a brick chimney

Why One Calendar Works Better Than Two

Replacing a roof under solar involves two trades whose work depends on each other in a fixed order. The array must come off before the old roof is torn off, the new roof must be complete before any mount is installed, and every mount must be flashed before a module goes over it. When the roofer and the solar crew keep separate calendars, gaps open between those steps: modules wait in storage longer than needed, shinglers show up while the modules are still bolted down, or flashing is rushed so the reinstall can happen. We avoid that by booking the whole job as one itinerary from the first phone call. That itinerary runs in a fixed order: records and power-down, takedown and warehousing, shingles laid on a bare deck, attachments sealed in, then reinstall and an output reading. Every date is confirmed with the roofer ahead of time, so no step waits on another. A single person on our side handles every solar question, and the roofing dates are booked around that work from day one. Many homes in and around Orland Hills are reaching this point, and the result we plan for is the same every time: shingles that keep water out around each attachment and modules generating at their old level.

What the Coordinated Job Covers

Each step in order, from the first visit to the final reading.

  • Shared calendar

    Removal, roofing and reinstall dates agreed together.

  • Documentation and shutdown

    Photos and an output reading, then power isolated.

  • Takedown and warehousing

    Modules, rails and wire runs lowered, tagged and put away.

  • Bare deck for the roofer

    Shingles go on without any solar hardware in the way.

  • New mounts

    Attachments installed for the original layout.

  • Flashing

    Each mount and conduit penetration sealed into the new roof.

  • Reinstallation

    Modules returned to position and reconnected.

  • Production check

    Output compared with the original reading.

How the Coordinated Reroof Proceeds

  1. Agree the sequence

    First comes a review of the shingles, the modules and your timing, then a visit. A firm solar quote follows, usually within 48 hours, with the itinerary attached.

  2. Takedown and reroof

    Modules are photographed, unhooked and warehoused, shingles are replaced, and fresh attachments with seals go into the finished surface.

  3. Reinstall and check

    Each module goes back on its recorded spot, wiring is restored and an output reading confirms the result. You keep a full copy of the records.

Why Homeowners Coordinate It With Us

  • One point of contact

    No relaying questions back and forth between trades.

  • Minimal downtime

    Booked dates keep the modules down only as long as the roof work needs.

  • Care at the attachments

    Every place the array meets the new roof is checked before it is covered.

  • Shared calendar
  • Open deck
  • Flashed mounts
  • Production checked

Ready to Plan a Roof Under Your Solar?

Set the sequence before work begins. Call and we will quote the solar portion and lay out the calendar.