Roofing company scheduling
Contractor Detach and Reset in Orland Hills
Takedown slotted in front of your strip date and reinstall slotted behind your final course, priced per panel for your bid.
Keeping Your Crew's Schedule Intact
For a roofing company working the southwest suburbs, a reroof with solar on it introduces a dependency your crew cannot control: the array has to be off the roof before tear-off, and putting it back afterward involves electrical work and careful module handling that sits outside roofing. We take that dependency off your list. Phone in the job location, a rough module total and the strip date; after a look at the array, a per-panel figure comes back that fits right into your estimate, along with a takedown slot ahead of your mobilization. At the booked slot, we isolate power, disconnect the strings, then lower every module, rail and wire run, tag it and truck it to our warehouse, leaving a clean surface for your crew. Once the shingles are finished, a quick call brings us back to anchor fresh attachments, seal each opening, return the modules to their original layout, rewire and take an output reading. If weather moves your start, we adjust our dates to match. We coordinate directly with your foreman or project manager, and we report back to you, because the homeowner is your customer and the relationship stays with you.
What the Subcontract Includes
The solar portion of your reroof, scheduled around your crew.
Per-panel quotes
A simple unit price for your own estimate.
Removal before tear-off
The array cleared ahead of your crew's start.
Nothing left on the roof
Rails, clamps and wire runs lowered along with the modules.
Storage off site
Everything labeled and kept away from your job.
Reinstall after your install
Fresh attachments and seals after your final course goes on.
Direct scheduling
Date changes handled with your foreman or project manager.
Production check
The system confirmed working before we leave.
Claim documentation
Itemized solar scopes for reroofs tied to insurance claims.
How We Fit Your Timeline
Send the job
Job location, module total and strip date. After our look, a per-panel figure follows, usually within 48 hours.
Clear the roof
Ahead of your start, the array is shut down, disconnected, removed, labeled and stored.
Reinstall on your word
Shingles done? Ring us, and attachments, seals, modules and wiring go back in that order, finished with an output reading.
Why Roofing Companies Book Us
Dates kept
Your tear-off depends on our removal, and we schedule accordingly.
Nothing left behind
Your crew starts on a clear deck every time.
Your customer relationship
We complete the solar portion and report to you.
- Per-panel quotes
- Removal before tear-off
- Clear deck
- Production checked
Have a Solar Reroof on Your Schedule?
Phone in the job location, module total and strip date. A per-panel figure and a takedown slot that suits your crew will follow.